"Everybody Wants to Get Stoned"

In Today's post, I will live up to my reputation as a man of few words. I will let the updated pics do the talking:









The masonry work is coming along very quickly. Our tile is lost in transit (thanks UPS), but the work continues on the decking.

Today is pretty dreary in Austin, with a dense, creepy fog hanging around. However, despite the gloomy day, the moisture actually helps bring out the true color of the tan Leuders stone.

There are a few things that need to be tweaked here and there, the cap needs to be added to the retaining wall and the lower deck by the basin needs to be done, but we're almost there with the masonry work!

I'm anxious to find out when/where the tile is and when we can start getting that underway. With Christmas coming up, I'm sure we're about to hit a major delay, so I am very happy to see so much progress. Would love to have the tile done prior to the wait, as the grout needs time to set before adding water, but that is looking less and less likely. BTW, how do you lose 700lbs of tile??

We are probably looking at holding off on the bathroom/kitchen underneath the wood deck for the time being, just to let things play out for a bit with the current economic situation. There are some MAJOR plumbing issues to contend with since this future bathroom is beneath grade and getting the bathrooms' "output" to the sewer at the front of the house is a real ordeal and involves tanks, pumps, grinders, and long/big pipe run under the driveway! Probably doesn't take a genius to figure that equals money and since it's not a necessity at this point, we've decided that it might be smart to keep this as a true "phase 2" as originally planned.

Update: LOL

I don't even know what day it is anymore in relation to this pool build. There is so much idle time, that I have a hard time keeping track of "working" days, as I originally planned. I do see the builders almost every day, but some days it's simply to pickup the bobcat or load up their tools.


Don't take this as a sign of frustration. It's really not. Honestly, I'm pretty satisfied with the progress of the pool. I knew that it would take awhile, and frankly we're in no hurry. It's winter, for crying out loud! However, it does get a bit tiresome looking at the wreck in our backyard. It really is starting to shape up and we're getting very excited. Hence, the desire to hurry. But I also understand, that haste leads to mistakes, and that's the last thing we want.

The update to progress will be very short. They removed the wooden forms last week, and the tedious duty of "watering" the pool is no longer required. Spending approximately 20-30 mins spraying down the concrete 2 times a day, seems like the biggest exercise of futility I've ever experienced, but I've been assured by both my pool builder and the trusty internet, that it is worthwhile. I just approached it like meditation, and gave me a little time outdoors with me and my thoughts. And in all fairness, I delegated much of the watering to El Kiddo numero uno, who did a subpar job at best, but kept me from having to do it EVERY time!

We did make a few changes to the original plan last week. We have decided that all 3 decks will be natural stone, instead of just the main deck. This decision was a major financial decision, but one we thought long and hard about. We will be much happier in the long run with this decision, me thinks. As a result, we need to get the other two decks formed and poured so that the masons can begin work on coping, decking and tile. After some discussion about the sizes of the remaining decks, we are supposed to be formed and poured by Saturday. However, no one showing up for the past two days leads me to doubt that timeline.

We are almost decided on ALL of our materials with the exception of tile. We're getting close though. I actually had a dream about the pool (not sure if that's a good or bad thing), and as a result, I now have some clarity on how it should look. And no, I didn't smoke any peyote before going to bed. I don't think I even had a drink...scary.

For those loyal followers of this blog, here are updates to The Good, the Bad, and the Ugly:

1. Spa. The spa remains "unfixed" although I know it will be taken care of. Much like tinnitus, the ringing is still there, I just don't notice it anymore.

2. The right angle. What right angle? This issue has been long forgotten. Our bad ass pool doesn't need no stinkin' right angle. Next...

3. Step. La Wiferina no likey. I don't have the energy to push this issue. I think in the grand scheme of things, we'll be fine without a larger step. I would rather worry about world peace and move on.

4. Rebar. The former assures me that he raised the rebar. He offered to break it up to prove it, but I would have to pay to replace if he is wrong. Rather than call his bluff, I'm going to trust that with all the eyes on the ground that day, it got taken care of. If not, I will be testing out our pool builder's guarantee/warranty. I hope I don't regret not taking Carlos up on his offer someday!
So, that about sums it up for now. Not a lot of progress, but this is to be expected. For those reading, please feel free to play along at home. Comment...this is much more exciting if this is interactive. I spend enough time talking to myself at home without having to do it over the internet.

Day 17: Today We Were Shot

As of Today, election day, we actually have a pool. I won't bore you with the "shotcrete vs. gunite" argument, you can research that on your own here if you're as bored with the election results as I am. I'll also refrain from voicing my political opinions here, but the good news is we actually have a pool. Back on topic, our pool builder only uses shotcrete, so that's what we got. The term "gunite pool" is therefore out the window for us, but I'm not sure what else to call it. At any rate, it is concrete and it has fibers in it, which supposedly makes it less likely to ever crack. If you want to research that, please do, and let me know what you find.

The process was fascinating to watch. They shoot wet concrete out of a tube and build up the walls of the pool in layers. Then, they smooth it out with amazing speed and accuracy, much like frosting a cake. It is really quite a production. The funniest part to me was watching them smooth everything out to a beautiful sheen, only to rough it up with a broom so that the plaster (MUCH later in the process) will be able to adhere to the concrete/shotcrete/gunite. The guy who will be rebuilding our wood deck came to watch a portion of the shotcrete, as he actually enjoys watching it. He actually had nothing to do at our site today, just came by to check it out.
They poured the main decking today as well. Things are really coming together. The downside is that things will more than likely start moving much more slowly from this point. We are at the point that we need to make final decisions on tile and stone. We're throwing around the idea of doing more stone decking and trying to determine what type of stone to go with. As previously mentioned, it's pretty overwhelming; the amount of decisions that have to be made.

I'll post a better pic of the completed status tomorrow...I have to go regroup in preparation of our new President.

Day 15: "Come Together"

Nothing too exciting to report today. The past few days have been "ahead of schedule" waiting for shotcrete (gunite), meaning the crews have been sparse and have been wrapping up loose ends. The last few days involved re-doing the stairs as some of the workers mis-measured. Good thing our PB spends a good amount of time on site! They completed the plumbing of the pool, water sheers, equipment pad, and finally, the spa. Watching them heat up and bend the PVC pipe is quite a sight. Probably one of those things best left unseen. I have a hard time believing the pipes aren't compromised by heating them up to the point of being practically liquefied and then bending them. I'm assured that they are sound. They put a bonding wire across all of the steel to keep the pool from getting electrified and put in some drainage pipes to keep the water flowing away from the pool. The main decking area and stairs are going to get poured with the pool on Tuesday. The last picture shows a view from the bottom of the pool on the back side of the negative edge. To get a good idea of the layout, the tree at the top is at 0 feet, with a retaining wall to the next level, approximately 2 feet lower. Go down another 2 feet to the main decking area and then 3 feet down to the negative edge basin.

Day 12: Underwater Basket Weaving

While watching the pool start to take shape, I became curious exactly what goes on in this phase. Rather than disrupt the guys, I did a little research of my own. I actually found this link on poolnerd's site pretty informative. Warning, it is long and highly technical, but really clarified to me what goes on during the creation of an "expansion joint" and what keeps the pool in place and the deck from moving and/or cracking.


Here is where they left us yesterday (Day 11). As you can see, the plumbing is stubbed and the steel is going up. Our pool builder uses 60 grade rebar on 9" centers. Most of the other builders we talked to use 40 grade on 12" centers. I'm not sure of the functional difference this makes, but I feel fairly confident that more substantial steel placed in a tighter grid is a worthwhile feature. The picture on the right shows the plumbing trench. 15 pipes to and from the pool. Pretty impressive. They filled it all in with sand so they can get the bobcat in and out of the yard.

The negative edge wall is starting to take place, with the basin (with play pool/tanning ledge) and spa on the back side of that wall. This picture is looking "through" the negative edge, with the basin behind it. We really liked the idea our pool builders came up with in the design phase to place the spa in the infinity edge basin and create an area there. One of our requirements was to make use of our existing "under deck" space and the current plan puts an outdoor kitchen/bar and future bathroom in that space. This area will be on the negative edge side of the pool, so it made sense to utilize this space. Our thoughts are it will be a great gathering area and make a nice visual area with the water features from the negative edge wall and negative edge spa. Our next door neighbors have a similar area that they do not use. However, it is on the opposite end of the pool from where they normally congregate. As a result of talking to them, we had a little bit of doubt. Now that it's starting to become a reality, I feel good about that decision.

In our discussion with the pool builder the other day, they suggested putting natural stone in the shallow part of the NE basin instead of plaster. We're more than likely going with Midnight Blue DiamondBrite for plaster, and it looks best in deeper areas. It is very "BLUE" and doesn't look it's best in super shallow water such as our basin. The two areas are completely separate, so this sounds like a cool idea. When I saw the Midnight Blue plaster in one of our PB's pools, I knew instantly that I wanted it! It was the color I had in my mind. Of course, after deciding that, I learned that it is the one DiamondBrite color that is an upcharge.

Tomorrow should wrap up the steel and plumbing...and then we'll wait for Shotcrete. We're scheduled for a week from today, so unless something changes, we'll most likely be idle for awhile.

Day 10: Starting to Take Form

The absence of recent posts is a result of little exciting activity (continued excavation) combined with the fact that I was out of town for a week and La Wiferino wasn't interested in updating. And frankly, there wasn't much progress made in that time. Very groundhog day!

We made it through the rain delays and all told, 8 days were spent excavating. What a process. Good thing, we didn't have some crazy "rock clause" which I've heard about. Now that we're done with that chapter, we're actually starting to see some progress!

Day 10 (actual working days, it's been 3 weeks since we started), things are actually starting to take shape. The gravel "french drain" is about 12 inches deep and should keep the water in the rock moving under the pool versus trying to go through it and essentially popping the pool out of the ground. Sounds pretty scary, but our pool builder assures us that this is common in this part of the world. Five guys showed up this morning (Saturday) and have been getting after it all day "bagging". The picture below shows our dog helping out. She loves all the excitement going on in her backyard! It's pretty amazing how much fill and rock is still left. Even more amazing is that our PB says the excavator took too much away and they're going to need more.

While I consider myself to be pretty good at getting the vision from the 2D drawings, as things are starting to come together, I realize just how many details I've missed. I joked with my pool builder that this is why I have my job and he has his. At this point, I can't even imagine doing an "owner build" and trying to manage the process myself. I feel like our project is way too complex and that would quickly get out of control. I never considered going that route, although several people did suggest it. In fact, as we watch this project evolve, it really makes us glad we made the choice of pool builders we did. We talked to MANY companies and the majority of them wanted to build what would essentially be an out of ground pool. Our goal was to take advantage of our view, yet work within the confines of the terrain and natural lay of the land. Very few pool builders were able to deliver on this vision, and as I watch this slowly unravel, I can see why. I must say, I'm glad we're not going to end up with a huge structure in our backyard with massive walls on the backside. Some companies said there was no way to do it without have 8-foot walls on the back of the pool! I know we're not talking about some engineered bridge or high-rise, but the scope of this "little" project never ceases to amaze me.

We're now in the forming stage. They will continue bagging the negative edge walls and spa and then they will do the steel and plumbing. We are scheduled for Shotcrete in a week, so this is the meat and potatoes of the build. They're also going to pour the main deck and turndown on that day so that everything stays solid through the process. I'm anxious to get to that point, as things will really be clear. It's amazing how hard it is to articulate how this pool is actually going to end up looking to people. We have multiple levels and this is far from a standard design.

So far, we've been very happy with our yet to be named pool builders. Despite the length of time we've been at it(relatively long for where we are), the factors were out of their control. They've been communicative about everything. They also took our change request in stride and didn't miss a beat.

Day Four: Making the Grade

It's not supposed to rain in Austin...

Excavation continues at a crawl. Rain is forecasted for the next few days which will put any further progress at a standstill. This creates a bit of a conundrum. You see, with the sprinkler system in shambles, it sure would be nice to get the water. However, at the cost of "no worky" until next week, my vote is no rain. Kind of like the presidential election though, I'm really not sure how much my vote really counts. Oh well, out of our control. We'll see what happens.

The only visible changes today are the increasing mounds of rock and dirt accumulating in the yard and the formation of the various levels. It is actually good to see those taking place, as the 2D renderings are difficult for most to follow. The design has several different tiers and levels, and watching them form helps a great deal with the overall vision.

One thing we are anxious to see happen, are the stairs leading down from the deck getting rebuilt. El Duderino's wife lost her mother in March of this year from a fall down a flight of stairs, so this has been a sticky point with us from the get-go (ignored by most of the PB's we talked to). As you can see from the picture on the left, the narrow/steep stairs would be a recipe for disaster combined with wet feet and the little duderinos. The deck should be demoed soon and we can't wait to see those steps go away! Apparently, the wood worker, not unlike the excavator, is a one-man-show and works at a snails pace (with laser precision). Good thing Spring isn't around the corner!


Chance of T-storms
50% chance of precipitation


It's not supposed to rain in Austin...



Day Three: "Ch-ch-ch-ch-changes..."

Over the weekend, I read about a few pool build threads on the internet: Part inspiration, part curiosity. I was pretty shocked to see the progress some people make in each passing day. I saw one pool that was excavated in one day and then all the steel and plumbing was completed by day two. Gunite on day three. Not us.

We're approaching our second week. Friday was a day off for the excavator for several reasons. One, I've learned Delton is quite the character and has a lot of other "interests" besides wreaking havoc on unsuspecting people's backyards. Second, while digging, we have encountered a water "issue" and were letting things dry out a bit. For those familiar with the current Austin weather conditions, you know I'm not talking rain. Apparently, they have hit some sort of spring. Not a show stopper by any means, but a slight hiccup in the process.


Over the weekend, we addressed some of the issues we had with the pool design. Mainly, the fact that we felt the actual pool was a little too close to the house. Probably would have been a good idea to determine this prior to excavation beginning, but our pool builder took the news in stride and was out first thing this morning, making the necessary changes. Despite our pool builders working on these changes until close to midnight on a Sunday and showing up first thing this morning to lay them out, we think we'll ultimately be much happier with this revision. Score one for the pool builders! Keep this up and they may get their name in lights on my humble little blog sooner rather than later!

So today, a no-school holiday, began at 7:20am with more jackhammering. This awoke both of our kids and probably most of the neighborhood as well. I guess the plan is to push forward until/unless someone complains. Nothing drastic in the way of progress today, but the excavator did hit a water main in the sprinkler system and after locating the mysterious valve that has been overtaken by 9 years of shrubbery growth, we were fine on that front.

So, here we are after day three. The pool still has a ways to go in terms of digging and the grading for the decking is starting to take place. Of course, we just found out the excavator wasn't made aware of the "new" decking plan, so it will be interesting to see how that pans out, since he already starting removing earth where the "old" plans had decking. Will we get additional decking out of this or will they come up with some other interesting solution? Tune in tomorrow to find out. Until next time...

Day Two: Rock and Roll

Today, day two of excavation, started early. At 7:45am, the jackhammering began and the major rocks were broken up. There wasn't too much "dig" progress today, but mostly breaking large boulders and hauling them away.

Five truckloads of rock were taken out today and tomorrow the digging will commence.

The excavator told me there's probably 3-4 more days until all of the excavation is completed. The grading issues and tiered decking are all requiring additional digging, so that combined with all the rock he's hitting, explains the extended length. Again, this doesn't seem to be too far from the norm for this area.

I had a nice conversation with the excavator today while he was filling up the CAT with fuel. He's an older gentleman and owns all the equipment and works alone. He told me that it's been pretty slow this year, and year to date he's at about 50% of his normal annual earnings. We discussed the economy a bit and the high price of diesel. Talking to him made me feel a little better about our decision to move forward with this project. He shared with me that two of the dump trucking companies they work with have closed down recently, and it made me realize that maybe our "little" contribution to the economy can help keep a few people afloat for awhile. I just hope things start turning around sooner rather than later, so we're not having to cash in on the karma card!

The above picture shows the end result after 2 days of excavation. It is actually starting to look like a pool, but we still have a long ways to go.

Day One: Excavation Begins

What's cooler than a tractor in the backyard to a 2-1/2 year old? Two tractors in the back yard!





Today, excavation began. While it is very exciting to finally get things underway, being present for the dig is sort of akin to watching paint dry. However, it is pretty interesting.

The excavation began smoothly until they hit rock at about 8-9 inches in. Living in the Central Texas Hill Country, this comes as a surprise to no one. Luckily, in this part of the world, hitting rock is expected and doesn't typically lead to additional expense for the home owner. It does drag the process out quite a bit though!

It is fascinating how much the compressed dirt and rock "expands" once it comes out of the earth. The mountains have piled up quickly and our backyard is quickly becoming a certified disaster area. Luckily, our house is high enough up that we don't have to look at all the mess from inside.

At this point, all of the excitement from months of planning and working on details is becoming disbelief that we're actually underway and facing this for the next 3-plus months (I'm being optimistic here).

Day Zero: Layout

So here is the backyard, prior to the bomb going off.

Unfortunately, I got an email from our pool builder at 6:45am this morning letting me know they had done the layout last night and were ready to begin excavation today. Needless to say, this was not a good situation since I was out of town and neither of us had gotten a chance to check out the spray painted layout in our yard.

After several frantic calls by my wife and I, they delayed the dig one day so that I could view the layout...whew. However, in all the confusion, the excavator did remove the tree that happened to be placed smack dab in the center of our soon to be deep end. Wish I had a true "before" pic, but I don't think I do. The picture above is as good as it gets.

The layout is a bit hard to see. My initial concerns with the renderings were that the pool was a little too narrow at the narrowest spot. This was confirmed by the layout and they are making an adjustment. We're also wondering if it's a little too close to the house, but like all things in life, we had to make some compromises. Decking is a huge expense and in a cost saving measure, we're a little closer to the house than we might have hoped for. Also, based on the extreme grading issue in our backyard, the designers made a judgment call on where they thought it would work best.

I think ultimately, we'll be happy where it is, as it will preserve a good portion of grass and yard on the back side of the pool.
Posted by Picasa

About Me

My photo
Austin, TX, United States
I'm the dude, so like, thats what you call me, duder, his dudeness, or el duderino if you're not into the whole brevity thing. I was, uh, one of the authors of the Port Huron Statement. The original Port Huron Statement. Not the compromised second draft. And then I, uh...Ever hear of the Seattle Seven? That was me...and six other guys. I deal in publishing, entertainment, political advocacy, and...Seriously? Besides living vicariously through Big Lebowski movie quotes, I am currently being raised by two boys, aged 10.5 and 2.5. And please, don't underestimate the importance of those .5's! I have one remaining dog and one wonderful wife. I am down to only one house and one job, so life is good. In addition to pretending to be a satirist blogger, retired/aspiring(?) musician, I am responsible for millions of dollars worth of ones and zeros being sold around this great nation. I am politically conservative, yet not politically correct. I am not looking for new friends, and like to keep my religious views to myself. If you want to know more about me, you have issues and should seek help!